System Configuration Information
These information can be changed if the corresponding operational model is modified.
GPC Pretoria
GPC Pretoria
| When was the current long-range forecast system implemented? |
2007 |
| Is it a coupled forecast system? |
No |
| Is it a Tier-2 forecast system? |
Yes |
| Atmospheric model resolution |
T42/L19 |
| Ocean model (if applicable) |
N/A |
| Source of atmospheric initial conditions |
ECMWF analysis data |
| Source of ocean initial conditions |
|
| If Tier-2, what is the source of SST predictions? |
optimum interpolation v-2 |
| Hindcast Period |
1981-2001 |
| Ensemble size for the hindcasts |
6 |
| How is the hindcast ensemble configured? |
time-lagged average |
| Ensemble size for the forecast |
6 |
| How is the forecast ensemble configured? |
time-lagged average |
| Length of forecasts |
5 months |
| Data Format |
GRIB 1 |
| What is the latest date predicted anomalies for the next month/season become available? |
5months(sep, oct, nov, dec, jan) and 3 rolling seasons(son, ond, ndj) |
| How are the forecast anomalies constructed? |
2.5 X 2.5 resolution |
| URL where forecast are displayed |
2meter temperature , precipitation |
| Point of Contact |
Asmerom Beraki
(asmerom.beraki@weathersa.co.za) |